At the blog side the stories start from year 2016, as in the stories.
Reading texts in chronological order may be more logical, but the order of course depends on the reader.
Here is few stories from the early years to begin with:
Here you also find a great story of the sailing from Hamburg to Finland.
Engine seawater pump being insgtalled
Pump going there?
The seawater pump finally changed from an electric pump to a belt drive. The biggest problem was where to place it, in the end suitable and the only such place was found under the charger. To do that, I had to make a mounting piece that I bolted to the front mounting bracket of the engine. The attachment itself had to think for a moment about what it should look like. This is how it turned out:
Launch 2020
Launch once again quite late
Launch was - again - just before midsummer. The original planned date was much earlier….
Bilge being closed
New plates installed
The new bilge top plates are getting welded to place and one critical work starts to be ready, at least almost since some paint is of course needed on top of Zinga.
Varnish done 2020
Varnished
All four cans of varnish went to the right place = Ariadne.
Making hatch to cockpit floor
Ilmava sitloodan pohja
Since the power line had a thrust bearing on the propeller shaft, I decided to make a hatch to the bottom of the cockpit.
Pilssin peittolevyt tyƶn alla
Peittolevy alkaa valmistua
I made the new bilge top plates from steel plate and L size steel. They stayed well straight since I did not weld everything in one go.
Bilge work
Bilge got ventilated
After tidying up, there was about 70cm on both sides, ie two arches empty, height about 15cm.
Thruhulls...
These were removed
All thruhull fittings and valves were replaced to Truedesign products and pipes/hoses replaced as well
You can start boat spring in autumn
Better to start early
Ariadne was taken up at the familiar shipyard in the fall